Installation Guide
Day 1 |
|
Dig a 4' depth rectangle with 2' radius corners |
|
Day 2 |
|
Installation of pool panels and bracing |
|
Day 3 |
|
Install Aluminum Coping and apply bottom concrete ringbeam |
|
Day 4 |
|
Apply floor screed |
|
Day 5 |
|
Install pool liner, add the water and commence backfilling |
|
Day 6 |
|
lay top concrete ringbeam |
|
Day 7 |
|
Connect up filtration unit and ENJOY! |